From dream to reality
Technical preparation and release for production
As soon as the order has been placed, it is handed over to the project manager. The project manager takes care of any outstanding issues on site. This sometimes includes the selection of colours, fabrics, materials, decors and, for example, the clarification of technical requirements.
The technical preparation department then creates detailed workshop drawings, which serve as the basis for production and ensure that all requirements are precisely implemented.
This is followed by a request for approval for production within 48 hours.
After approval, no more changes are possible without additional effort. The material can now be ordered and production can start!